Project

Kobelco BM700 crawler crane

  • Place the base section on one of our flat beds

  • Remove 2 x main chord and related lacings and check and prepare remaining parts

  • Cut and prepare new main chords and lacings

  • Straighten the bottom 2 main chords

  • Check straightened areas

  • Fit, align and weld new main chords and lacings

  • Check new butt welds by X-ray method and new welds of lacings by MPI method for cracks and/ or indications

  • Shot blast and paint the section

  • Kobelco bm700 after restoration at our depot
  • Kobelco bm700 being painted at our depot
  • Kobelco bm700 before restoration and reparation at our depot
  • Kobelco bm700 on the truck after being restored and repaired at our depot

Would you like to know what else we can assist you with? Feel free to contact us.

Background overlay 'Avezaat'